MARY ISAAK CENTER Petaluma, CA Northern Electric Inc. was proud to be a part of the construction of the Mark Isaak Center, a 22,101 square foot facility that assists those in need of emergency shelter. As the electrical contractor, NEI was responsible for installation of the entire electrical system. General Contractor: Midstate Construction Electrical Engineer: O’Mahoney & Myer |