CAYMUS CORDELIA WINERYFairfield, CA The complete electrical instillation of Barrel Storage, A Bottling Line, Offices, Loading Docks, Site Infrastructure/Cloacina Process Waste Treatment Plant, and SCADA Automated Building Control System. Scope of work included lighting, power, lighting control, site lighting, security, telecommunications and fire alarm systems. General Contractor: Wright Contractors Electrical Engineer: Summit Engineering |